The construction project manager chooses the contractor of the project as soon as the design is completed. In some cases, this can happen even when the project is still in development. The selection is based on an auction process with various contractors. There are three prevailing methods based on which a contractor is picked: low-bid selection, best-value selection and qualification-based selection.